OUR BUSINESS MODEL

OUR BUSINESS
MODEL

AT IENOVA WE ARE FIRMLY COMMITTED TO OPERATE IN A SUSTAINABLE MANNER TO ENSURE OUR LONG-TERM SUCCESS. OUR VISION OF SUSTAINABILITY IS EMBEDDED IN OUR BUSINESS MODEL.

 

WE ARE A MEXICAN COMPANY THAT DEVELOPS, BUILDS, AND OPERATES ENERGY INFRASTRUCTURE IN THE COUNTRY. WE OPERATE IN THREE MAJOR BUSINESS SEGMENTS:

GAS

Natural gas and ethane pipelines, compression stations, and sale and distribution of natural gas.

STORAGE

Storage and regasification of liquefied natural gas (LNG), LPG storage and pipelines, and storage of refined products.

POWER

Natural-gas-fired, combined-cycle power generation facility, as well as wind and solar power generation facilities.

REVENUES BY BUSINESS SEGMENT

ASSETS IN OPERATION

1 Asset belonging to the joint venture with Brookfield, in which IEnova holds a 50% stake.
2 Asset belonging to the joint venture with TC Energy, in which IEnova holds a 40% stake.
3 Asset that started operating during the first half of 2021.
4 IEnova acquired 100% of ESJ on March 19, 2021.
5 Asset that started operating during the first half of 2021.

ROSARITO PIPELINE (GR)

302 km

TRANSPORTADORA DE GAS NATURAL DE BAJA CALIFORNIA (TGN)

45 km

SONORA PIPELINE (SÁSABE-GUAYMAS SEGMENT)

505 km

SONORA PIPELINE (GUAYMAS-EL ORO SEGMENT)

330 km

RAMAL EMPALME

20 km

AGUAPRIETA PIPELINE (GAP)

13 km

NACO COMPRESSION STATION

14,340 hp

LOS RAMONES I PIPELINE

116 km

LOS RAMONES NORTE PIPELINE1

452 km

SAMALAYUCA PIPELINE

37 km

OJINAGA–EL ENCINO PIPELINE

220 km

SAN ISIDRO-SAMALAYUCA PIPELINE

23 km

SAN FERNANDO PIPELINE

114 km

ETHANE Pipeline

224 km

SOUTH TEXAS-TUXPAN PIPELINE22

800 km

TDF LPG TRANSPORTATION SYSTEM

190 km

ECOGAS (NATURAL GAS DISTRIBUTION PIPELINES)

4,367 km

LPG STORAGE TERMINAL IN GUADALAJARA

80,000 bl

LIQUEFIED NATURAL GAS STORAGE AND REGASIFICATION TERMINAL, ENERGÍA COSTA AZUL (ECA)

320,000 m3

VERACRUZ TERMINAL3

2.1 mmbl

TERMOELÉCTRICA DE MEXICALI (TDM)

625 MW

ENERGÍA SIERRA JUÁREZ (ESJ)4

47 wind turbines
155 MW

VENTIKA

84 wind turbines
252 MW

PIMA SOLAR

110 MWAC

RUMOROSA SOLAR

44 MWAC

TEPEZALÁ SOLAR

100 MWAC

DON DIEGO SOLAR

125 MWAC

BORDER SOLAR5

150 MWAC

ASSETS UNDER CONSTRUCTION AND DEVELOPMENT

200 km

60,000 hp


Project under development which consists of expanding and extending the Rosarito Pipeline and one compression station to meet ECA Liquefaction’s transportation requirements.


It is estimated that it will be operational prior to the start of operations of ECA Liquefaction.

650,000 bl


In-land storage terminal for refined products in Valle de México.


650,000 bl


In-land storage terminal for refined products in Puebla.


1.18 mmbl


Marine terminal for the receipt, storage, and delivery of refined products in the port of Topolobampo, Sinaloa.


It is estimated that it will be operational in the second half of 2021.

1 mmbl


Marine terminal for the receipt, storage, and delivery of refined products in Ensenada, Baja California.


It is currently under development.

In-land storage terminal for refined products in Guadalajara, Jalisco. It is currently under development.

2.3 mmbl


Marine terminal for the receipt, storage, and delivery of refined products in the port of Manzanillo, Colima. It is currently under development.


12 Mtpa


Natural gas liquefaction plant, adjacent to the ECA Terminal, that is being developed in two phases. Phase 1 is currently under construction and Phase 2 is under development.


It is estimated that the first LNG cargos will be ready for export in the latter part of 2024.

108 MW


Expansion of the Energía Sierra Juárez wind park, located in the Sierra de Juárez mountain range in the municipality of Tecate, Baja California.


It is estimated that it will be operational in the second half of 2021.

1 Asset belonging to the joint venture with Trafigura, in which IEnova holds an 82.5% stake.
2 Asset belonging to the joint venture with Sempra LNG and a subsidiary of Total, in which IEnova holds a 41.7% stake.